Your Backyard Home, Built with Steel.
Detached ADUs • Attached ADUs • 1–2 Bedroom Designs
Detached ADUs • Attached ADUs • 1–2 Bedroom Designs
Built On-Site
Designed and constructed specifically for your property.
Steel Framing Available
Engineered cold-formed steel available at no added cost over a comparable wood-framed design.*
Kansas City Metro
Local construction, permitting coordination and project management.
Flexible Finish Levels
Choose Shell, Hybrid or Turnkey depending on how much you want us to complete.
Choose Your Package
SHELL
- Structure and exterior
- Steel or wood framing
- Roofing, windows and doors
- Best for owners completing much of the interior
HYBRID
- Shell construction
- Major mechanical or interior scopes selected with you
- More flexibility over budget
- Ideal balance of contractor + owner participation
TURNKEY
- Complete construction
- Interior finishes
- Mechanical systems
- Ready for final occupancy after inspections
1
Project Discussion
Tell us what you want to build, approximate size and intended use.
2
Site Review
We evaluate your property, access, utilities and likely placement.
3
Design & Engineering
Plans are developed around your property and selected construction system.
4
Permitting
Required drawings and documentation are prepared for local review.
5
Construction
Your ADU is built on-site and progresses through required inspections.
Frequently asked questions
Is an ADU allowed on my property?
Rules vary by city, lot and project type. We can review your property before you commit to construction.
Does steel framing cost more than wood?
For qualifying designs, Tiny Terra can offer engineered steel framing at no added cost compared with a comparable wood-framed design.
What is the difference between Shell, Hybrid and Turnkey?
The packages determine how much of the project Tiny Terra completes versus work you may choose to finish separately.
How much does an ADU cost?
Cost depends on size, site conditions, utilities, foundation, finishes and permitting requirements. We prepare project-specific estimates rather than advertising a misleading one-size-fits-all price.
How long does the process take?
The timeline depends heavily on design and municipal permitting. Once we review the property, we can provide a more realistic project schedule.
Can you build an attached ADU?
Yes. We can evaluate both attached and detached concepts depending on the property and local requirements.

tinyterrahomes@gmail.com
Address
38750 W 151st St Eudora, KS 66025
Phone